Nov. 11, 2022, 2:11 a.m. | Vanamala Venkataswamy

cs.LG updates on arXiv.org arxiv.org

This paper studies a model for online job scheduling in green datacenters. In
green datacenters, resource availability depends on the power supply from the
renewables. Intermittent power supply from renewables leads to intermittent
resource availability, inducing job delays (and associated costs). Green
datacenter operators must intelligently manage their workloads and available
power supply to extract maximum benefits. The scheduler's objective is to
schedule jobs on a set of resources to maximize the total value (revenue) while
minimizing the overall job …

arxiv datacenters job scheduling

Software Engineer for AI Training Data (School Specific)

@ G2i Inc | Remote

Software Engineer for AI Training Data (Python)

@ G2i Inc | Remote

Software Engineer for AI Training Data (Tier 2)

@ G2i Inc | Remote

Data Engineer

@ Lemon.io | Remote: Europe, LATAM, Canada, UK, Asia, Oceania

Artificial Intelligence – Bioinformatic Expert

@ University of Texas Medical Branch | Galveston, TX

Lead Developer (AI)

@ Cere Network | San Francisco, US